Who should hold the building permit?
https://mdsnow2017.com/clifton-construction-leading-commercial-and-industrial-construction-in-albany-ny/
The contractor, in nearly every case. A permit pulled in the owner name shifts code responsibility to the owner, which is occasionally proposed as a way to move faster. It is not worth it.